ELECTRICAL AND INSTRUMENTATION WORKS

ELECTRICAL AND INSTRUMENTATION

INSTRUMENT

  • Pressure / temperature / flow transmitter / gauge calibration activities in industrial facility process lines.
  • On-off / control valve calibration and installation activities in industrial facility process lines
  • Underground and aboveground cable route installations (conduit / tray)
  • Assembly of all types of panels and interconnect boxes
  • Installation of all types of instruments in and on pipes
  • Installation and leakage tests of Process/Pneumatic HP/LP tubing lines
  • Main and secondary cable pulling and termination
  • Welded, twisted or other types of instrument-to-process line (hook up) connection assemblies and leakage tests
  • Installation of ESD/DCS/Network/PDP/Vibration panels in the instrument control building, termination of cables between panels and from the field, performing loop testing after SAT activities
  • All quality control and documentation processes

ELECTRIC

  • All mechanical assembly works with both infrastructure and superstructure electrical connections such as cable trays and conduits
  • Grounding and lightning protection installations and tests
  • LV, MV and HV cable pulling, connection and tests
  • Installation, testing and commissioning of all types of transformers, panels, breakers, busbars, battery systems and generators
  • Building and process areas lighting and socket installations, tests and commissioning
  • LV and MV motor installations, rotation (MSR) tests and commissioning
  • All quality control and documentation processes